Notes for buyers
What to specify,
and what to ask for
Technical notes on low- and medium-voltage equipment and industrial automation, written for the person putting the enquiry together. Each one answers a question a buyer actually asks before an order is placed — what a rating has to be backed by, what a quotation should state, and which piece of evidence separates a supplier who can deliver from one who cannot.
-
8 September 2026 · Buyer's guide
Contactor vs relay vs motor starter
Three different jobs on the same single-line diagram, not three sizes of the same part. What each is allowed to switch, why the AC-3 rating rather than the AC-1 figure on the same frame governs motor duty, a worked example where the duty cycle rather than the current picks the frame, and what an enquiry has to state for each device.
-
1 September 2026 · Buyer's guide
Switchgear testing: the evidence a buyer should require
Three occasions get called switchgear testing, and each produces a different document proving a different thing. Design against routine verification, what site acceptance closes that the works cannot, the six tests worth knowing by name, and the four things that separate a report that evidences a claim from one that only looks like it does.
-
25 August 2026 · Buyer's guide
Pad-mounted against pole-mounted transformer
The service route decides the mounting, not the cooling design. Why ground level triggers enclosure-integrity, dead-front and clearance rules that pole height removes, loop-feed against radial-feed at the bushings, and a worked footprint check that eliminates a pad on a 3.5 m easement.
-
18 August 2026 · Technical explainer
3 phase motor wiring diagram: reading the terminal box
Six leads, and the link pattern that makes them star or delta. What U, V, W and the 1/2 suffixes encode, the dual-voltage case, a worked 45 kW line-current calculation, and why star-delta gives a third of the current and a third of the torque by two different routes.
-
12 August 2026 · Buyer's guide
Dry-type or oil-immersed distribution transformer
Fire load and siting settle which one is admissible; insulation class, cooling, overload margin, part-load losses and maintenance settle what it costs to own. With a worked twenty-year cost-of-losses comparison showing why the cheaper transformer at the loading dock is not always the cheaper one.
-
12 August 2026 · Technical explainer
How to calculate available fault current
Prospective, bolted, symmetrical, asymmetrical — what a spec sheet assumes you already know. The infinite-bus shortcut and where it overstates, a worked point-to-point calculation out to a downstream panel, and the equipment ratings the number decides.
-
12 August 2026 · Buyer's guide
Type 1 SPD against Type 2 and Type 3
Where each type sits, what it is rated against, and why the three are a cascade rather than three options to choose between. Includes the parameters a specification must state and a worked example of how a 1.2 m connecting lead nearly doubles the voltage reaching the protected equipment.
-
12 August 2026 · Buyer's guide
Circuit breaker types: how to choose between them for LV and MV panels
The industrial slice only — air, oil, SF6 and vacuum, by voltage class and interrupting medium. What a quotation has to state for two offers to be comparable, why withstand and making current are not free choices, and a worked breaking-capacity calculation from a transformer's rating and impedance.
-
12 August 2026 · Technical explainer
Current transformer against potential transformer
One is wired in series and must never be opened under load; the other is wired in parallel and must never be shorted. Burden and accuracy class expressed differently for each, accuracy limit factor against voltage factor, and a worked check of whether a C200 CT stays within class through a fault.
-
12 August 2026 · Buyer's guide
What a data center PDU is, and how to specify one
"PDU" covers four distinct pieces of equipment — floor PDU, remote power panel, rack PDU and busway tap-off. Tier, monitoring grade, phase configuration and breaker coordination, with a worked phase-imbalance calculation and the enquiry checklist a comparable quotation depends on.
-
11 August 2026 · Buyer's guide
What drives the cost of a current transformer
Eight variables set the price — ratio, accuracy class, rated burden, accuracy limit factor, insulation level, construction type, enclosure rating and quantity. Includes a worked burden calculation showing why a long secondary run favours a 1 A secondary, and what an enquiry must state to get comparable quotations.
-
11 August 2026 · Technical explainer
How data centre power distribution works
The chain from utility entry to the rack, grouped by what each stage is for: conversion, continuity and subdivision. Defines PDU, RPP, busway and rack PDU, explains N+1 against 2N against distributed redundancy with a worked comparison at 300 kW, and shows how to read a single-line diagram as a fault-analysis tool.
-
11 August 2026 · Buyer's guide
How to choose a busbar manufacturer
Conductor grade and temper, the basis behind a current rating, thermal and electrodynamic short-circuit evidence, creepage at the supports, joint torque, laboratory accreditation and export packing — with a worked force calculation and a ten-question supplier evaluation table.
Send the duty, not the part number
A rating, a duty and an environment are enough for us to quote. Tell us what the equipment has to do and we will come back with what meets it.